First project visit - 16 Dec 2013

photo of foam insulationphoto of lining boards

photo of frame for bulkhead
I had not been expecting quite so much to have been done in the short space of time. The internal coating had been completed, and the spray-foam insulation (picture 1) had been done and covered with the lining boards (picture 2). The cross-bulkheads (between rooms) had been started, and the electric cabling and plumbing was under way (picture 3). The engine and gearbox had been fitted.