By the time Pat & I visited mid-January, all the lining boards and cross-bulkheads were in place. The final panelling had been cut and was away being polished. A mock-up of the galley (picture 1) had been prepared for us to see how the overhead lockers and breakfast bar would work. We decided that it would need changed! Undercoating was well under way on the outside of the hull (picture 2).